top of page

Construction of an elevated guideway (600 meters) including the substructure, and superstructure elements. Placement of structural epoxy, management of post-tensioning and grouting operations. Management of transportation from stressing yard to track limits with bearing and diaphragm installation. Construction of approximately 1,600 meters of mechanically stabilized retaining walls (RECO). Construction of staged Bloor Street overpass and an at-grade Pedestrian tunnel (Paton Road).

bottom of page