top of page
Complete superstructure replacement of an 8-span Metrolinx rail structure over the Eramosa River
Valley and two other rail bridge rehabilitation sites. The scope of work includes complete masonry
repairs, relocation and protection of existing utilities, jacking the structure to replace bearing
pedestals, concrete pouring and waterproofing of deck slabs and curbs, concrete forming and pouring
on the abutment and pier caps and installation of permanent pedestals.
1/1
bottom of page