top of page

Complete superstructure replacement of an 8-span Metrolinx rail structure over the Eramosa River

Valley and two other rail bridge rehabilitation sites. The scope of work includes complete masonry

repairs, relocation and protection of existing utilities, jacking the structure to replace bearing

pedestals, concrete pouring and waterproofing of deck slabs and curbs, concrete forming and pouring

on the abutment and pier caps and installation of permanent pedestals.

bottom of page